ABOUT OUR

Work

Explore our hallmark construction sites, where innovation meets excellence

COMMERCIAL

Costco Saint Augustine
(Owen Electric)
Costco Saint Augustine:
(Owen Electric)
Installation of all necessary electrical components of the building. This is to include: back boxes, cabling, homeruns, power devices, hearing impaired devices, smoke alarm devices, fixtures, terminations, equipment, disconnects, connection of appliances, panels, voice/data/TV box and cabling rough-in, firestopping, and hot checking as well as all punch list items.
School NN
(Owen Electric)
School NN:
(Owen Electric)
Provide labor, and all necessary items to complete the Scope of work that include: Turn- Key Electrical, all conduits, wire pulling, terminations, trim out, LV rough in, LV site conduits, primary conduits, site branch conduits, equipment hook-ups, Kitchen rough and trim, firestopping, hot check, all LV Systems raceways, data, Fire alarm and Systems (just the raceways), material handling and equipment rentals.
School OO
(Owen Electric)
School OO:
(Owen Electric)
Provide labor, and all necessary items to complete the Scope of work that include: Turn- Key Electrical, all conduits, wire pulling, terminations, trim out, LV rough in, LV site conduits, primary conduits, site branch conduits, equipment hook-ups, Kitchen rough and trim, firestopping, hot check, all LV Systems raceways.
Amazon TPA 3
(Aireko)
Amazon TPA 3:
(Aireko)
Furnish labor services for the installation of temporary power & lighting, conduits, wire, lighting fixtures and ventilation fans. Terminate all branch circuits in the panelboards. Receive, handle and store all materials and furnished.
Amazon Deltona FL MCO2
(Aireko)
Amazon Deltona FL MCO2:
(Aireko)
Furnish labor services for the installation of temporary power & lighting, conduits, wire, lighting fixtures and ventilation fans. Terminate all branch circuits in the panelboards. Receive, handle and store all materials and furnished.
Amazon HOU
(Aireko)
Amazon HOU:
(Aireko)
Furnish labor services for the installation of temporary power & lighting, conduits, wire, lighting fixtures, ventilation Fans, Water Cooler Rec. and Charging Stations. Terminate all branch circuits in the panelboards. Receive, handle and store all materials. Also included all necessary PPE for the employees, equipment (such as, scaffolds, ladders etc.).
MSS Distribution Center Savannah
(Aireko)
MSS Distribution Center Savannah:
(Aireko)
Provide Labor, hand tools, lifts, and personal protective equipment to perform electrical installation work. Work included all branch conduit, wiring, and terminations inside the warehouse and office area, for all systems from the panels to the device/equipment. Also included all branch systems for 120/208V, all 277/480V, UPS branch, and the F/A Conduit, installation of all lighting and power devices, along with terminations of HVAC and Plumbing Equipment.
Amazon VA
(Aireko)
Amazon VA:
(Aireko)
Furnish labor services for the installation of temporary power & lighting, conduits, wire, lighting fixtures, Exit Signs, Emergency Lights, Fans, Receptacles, Panels and Gear. Terminate all branch circuits in the panelboards. Receive, handle, and store all materials. Provide all labor for a complete electrical installation.
Sarasota City Light Poles
Main Street
(Power Desing)
Sarasota City Light Poles
Main Street:
(Power Desing)
Provide labor, supervision and materials for the installation of 21 Concrete bases (Steel and concrete form), 21 Lightr pole wiring and pull boxes for chrisymas rec. 21 Lights pole spare codunits and 21 LTP Feeds 120, 480V & trench.
Blue Beacon
Truck Wash Facility
(Brothers Group Construction Company)
Blue Beacon
Truck Wash Facility:
(Brothers Group Construction Company)
Provide Labor, hand tools, lifts, materials, and personal protective equipment to perform electrical installation work.
Margaritaville Hotel
(Owen Electric)
Margaritaville Hotel:
(Owen Electric)
Hotel Suite Rough-in, Trim Out, and Connections of all Electrical Outlets, Switches, Light Fixtures, Fans, Equipment (AHU’s and Condensers), Appliances, and Raceways for Telecom and Fire Alarm wiring in Corridors, Common Area Rooms, Closets, Offices, Electrical Rooms, Communication Rooms, Elevator Lobbies and Fitness Rooms.
Residence Inn JAX
(Owen Electric)
Residence Inn JAX:
(Owen Electric)
Provide labor and tools for a complete electrical system for the 135 Units. Install load centers, boxes, wiring, supports, fire caulking, lighting, fire alarm boxes, and sleeves. Rough-in, support, and terminate wiring from load centers. Install devices, plates, lighting fixtures, and fans. Perform Hot Check. Install boxes before branch wire per floor, branch wire, and cans in each unit type. Wire panels for approval before releasing rooms. Install and support unit panel sub feeds down corridors. Wire units per contractor's layout and schematics, install 3/4" ENT conduits and stub into corridor or common area as directed.

RESIDENTIAL

Calloway Cove Apartments
(Owen Electric)
Calloway Cove Apartments:
(Owen Electric)
Installation of all necessary electrical components (rough-in/trim-out) for power and lighting in 200 units. Work included installation of all necessary electrical boxes for devices and junction boxes, branch NM cable, devices, device plates, fixtures, smoke/carbon monoxide detectors, hearing impaired devices, connection of equipment/appliances, hot-checking each device, and punch list items located in the referenced areas of scope.
Valencia Way Apartments
(Owen Electric)
Valencia Way Apartments:
(Owen Electric)
Installation of all necessary electrical components (rough-in/trim-out) for power and lighting in (364) 1-, 2- and 3-bedroom units. Work shall include installation of all necessary electrical boxes for devices and junction boxes, electrical panels, branch NM cable, devices, device plates, fixtures, smoke/carbon monoxide detectors, hearing impaired devices, connection of equipment/appliances, hot-checking each device, and all punch list items located in the referenced areas of scope.
LIV+Gainesville
(Owen Electric)
LIV+Gainesville:
(Owen Electric)
Installation of all power, lighting, fire alarm, telecommunication. CATV wiring for the units, corridors, amenity spaces, electric rooms, courtyards, site, and common spaces, installation of all boxes, wiring supports, five caulking panel installation, SER installation and termination to panel from meter stacks; installation of meter stacks, panels, transformers, lighting fixtures, site lighting, landscape lighting ; installation and termination of all secondary feeders from transformers to the building panels; hot check of all units, corridors, common spaces and amenity areas.
Stanmore Wells Creek Apartments
(Owen Electric)
Stanmore Wells Creek Apartments:
(Owen Electric)
Installation of all necessary electrical components for 176 Units. This includes installation of devices, smoke alarm devices, fixtures, terminations, equipment, disconnects, connection of appliances, panels, voice/data/TV boxes. Rough In, Trim out and Hot Check as well.
The Station at San Marco Apartments
(Owen Electric)
The Station at San Marco Apartments:
(Owen Electric)
Installation of all necessary electrical components for the building, common areas, fitness center/clubhouse. This includes back boxes, cabling, homeruns, power devices, fixtures, terminations, equipment, disconnects, connection of appliances, panels and hot checking. Complete electrical installation of the parking garage including rough in, wire pull, trim out, equipment terminations, hot check, panel installation, testing, sky lounge, elevators, stairwells, etc.

Residentials

recursos

Costco Saint Augustine

School NN

School OO

Stanmore Wells Creek Apartments

Calloway Cove Apartments

The Station at San Marco Apartments

Valencia Way Apartments

LIV + Gainesville

Aireko

Power Desing

Brothers Group Construction Company

Scroll to Top